merchaint · help
Contact supportOpen Merchaint

Reading the builder

In this article

The Form view is a list you can edit. The Canvas view is a picture. Neither shows anything the other does not — they are the same workflow drawn two ways.

  • Why there are two views, and which one you will use
  • The four controls along the top, and the two tabs below them
  • Why the same two branches carry three different names
  • Where the Save button is, and why there is not one

01 · Why

Why are there two views?

The Form view is a list you can edit. The Canvas view is a picture. Neither shows anything the other does not — they are the same workflow drawn two ways, and you will mostly live in Form.

02 · How

The controls along the top

ControlWhat it does
Form / CanvasSwitch between the list and the picture
LogsEvery time this workflow ran — see See what your workflows did
SettingsPriority and safety limits — see Workflow settings
The status pillDraft, Active or Inactive
Saved · 10sHow long since it last saved itself

Below those, two tabs: Editor (what you are building) and Backfill (running it over records you already have — see Apply it to records you already have).

In the Form view, each step shows its number, its type, and a one-line summary. Click a step to open its settings on the right. Drag the handle on the left to move a step. Inside a step’s panel, Change swaps it for a different type and the bin deletes it.

03 · Notes

The two views name branches differently

A step that splits into two paths shows as IF and ELSE in the Form view, but APPROVED and REJECTED in the Canvas view when it is an approval step. Inside a condition step’s own settings, the same two paths are called Yes path and No path. Three names, one thing.

Canvas is for looking, not building

You cannot drag steps around it or zoom.

04 · FAQ

Common questions

Where's the Save button?

There is not one. Watch the Saved indicator instead.

Can I reorder steps?

Yes, drag them by the handle on the left in the Form view.

What do the numbers mean?

The order steps run in. Steps inside a branch get a decimal, like 02.1.